Image of San Lorenzo Valley Water District seal. 
Logo

San Lorenzo Valley Water District Board of Directors Director Mark Smolley

Overview     News Articles & Digest    

Address:   13060 Hwy 9, Boulder Creek, CA 95006

Official Links:   WEBSITE   ONLINE PAYMENT PORTAL   FACEBOOK

Picture of Mark Smolley

Director Mark Smolley

Contact the Director

LINKEDIN    

A Felton resident, Mark Smolley participated with the SLVWD Engineering Committee for two years before being appointed to the board in 2020. He also served as a board member for six years with Rebuilding Together, a nonprofit in San Jose focused on improving low-income housing. Smolley served as the utilities construction project manager at Apple Inc.’s 170-acre campus from 2015 to 2018, and in a similar capacity for UC San Francisco (2008-2014). A graduate of Penn State University, Smolley is a state-licensed geologist.


In November of 2022, he won election to a full four-year term on the board.

Related News

→ View All

San Lorenzo Valley Post logo From San Lorenzo Valley Post...

02/02/2025
Image for display with article titled SLV Water District Seeks Public Input for Local Hazard Mitigation Plan

The San Lorenzo Valley Water District released its draft 2025 Local Hazard Mitigation Plan (LHMP) for public review. The draft plan will be presented at the district's February 6 SLVWD Board of Directors meeting.

Press Banner logo From Press Banner...

01/17/2025
Image for display with article titled San Lorenzo Valley Water District Receives $100K Grant to Replace Aging Water Meters

San Lorenzo Valley Water District has been awarded a $100,000 grant to update hundreds of water meters in Ben Lomond.

San Lorenzo Valley Post logo From San Lorenzo Valley Post...

12/10/2024
Image for display with article titled San Lorenzo Valley Water District to Replace Aging Water Meters

The San Lorenzo Valley Water District has been awarded a $100,000 grant from the Federal Bureau of Reclamation to update hundreds of water meters in Ben Lomond, California. A total of 443 water meters are scheduled to be replaced with meters that meet current standards for leak detection, which will help reduce water waste. SLVWD is one of 36 projects across the U.S. that was awarded funding through this program.

Press Banner logo From Press Banner...

11/07/2024
Image for display with article titled SLVWD Board Appoints Interim General Manager

San Lorenzo Valley Water District Board of Directors recently announced it has approved a contract for John Kunkel to be interim general manager.

San Lorenzo Valley Post logo From San Lorenzo Valley Post...

10/19/2024
Image for display with article titled SLV Water District Board Appoints Interim GM

The San Lorenzo Valley Water District (SLVWD) Board of Directors has approved a contract for John Kunkel to be the public agency's Interim General Manager.